Hunter Twin Keeps Drilling Operations Going

A mud system issue causing poor performance with positive pulse tools that would have resulted in a trip for tools was avoided due to having the Hunter Twin EM / MP in the hole. The customer commented, "that while the mud system issue was being corrected it would have normally lead to a stop in drilling operations, as they were still receiving drilling data the operations continued. The mud system issue has been corrected and both systems are currently working fine."

Leave a Reply